During the summer 2013 we have conducted 4 experiments on the polish test dike. The first 3 experiments simulated one week flood wave with about 48hours culmination. The fourth one was devoted to a investigate a long, flat flood wave in period of two weeks. Fortunately, due to usage of soil-ash composite, we did not encountered any problems with damages caused by rodents or other animals. The results of measurements are processed now and we are preparing scenarios for next – autumn series of simulations.

Fig. 3. Dike saturation - animation